— Refresh Packages

One quote. Design, trades, and a finished property.

Three scoped packages for landlords and sellers. Pick the one that fits your property's condition and budget — no vague line items, no contractor juggling.

/ Three Clear Tiers

Choose the scope your property needs

Tier One
Tier Two
Tier Three

Cosmetic Refresh

Mid-Range Refresh

Comprehensive Renovation

Fresh paint throughout, updated fixtures, and light landscaping. Addresses the surface reasons a showing falls flat.

Includes Tier One plus kitchen and bath updates — new hardware, countertop refinishing, and flooring replacement in key rooms.

Full scope: structural repairs, full kitchen and bath remodel, exterior work, and a final staged walk-through before handoff.

Timeline: 5–7 business days. Result: market-ready presentation at entry-level cost.

Timeline: 10–14 business days. Result: measurable lift in days-on-market and offer price.

Timeline: 3–5 weeks. Result: move-in-ready condition, documented for listing or lease.

Close-up of a freshly installed kitchen faucet and updated cabinet hardware on clean white cabinetry, natural window light from the left, sharp detail shot showing the specific refresh point, documentary-style even exposure
Close-up of a freshly installed kitchen faucet and updated cabinet hardware on clean white cabinetry, natural window light from the left, sharp detail shot showing the specific refresh point, documentary-style even exposure
• Every Package Includes

Design direction, trades, and a final walk-through

Every tier starts with a design call to confirm scope, then moves directly to coordinated trades — no separate bids, no third-party scheduling.

The job closes with a documented walk-through. One invoice covers the full engagement: design, labor, materials, and sign-off.

Ready to scope your property?

Send the address and your target timeline. We respond within one business day with a fixed-price proposal and a confirmed start date.